Ridgeway Development Group
OKLAHOMA CITY
405-974-9963REQUEST A SITE VISIT
A commercial interior stripped to the framing and joists, mid build-out
COMMERCIAL

Commercial construction planned around your opening date.

We deliver ground-up shells, tenant improvements and restaurant build-outs across the Oklahoma City metro, with every schedule planned backward from the day you open.

REQUEST A FREE SITE VISIT

Your site visit and written, itemized estimate are free.

A commercial project is measured by the day the doors open. We plan the sequence, the trades and the inspections around that date, and you’ll see the schedule in your client portal from the first day on site.

Contracting
Hard bid, construction management or design-build
Coverage
Bonded and insured
Crews
Self-performed and managed by our team

Three delivery methods for commercial projects.

Each contract structure allocates cost and schedule risk differently. We’ll recommend the approach best suited to your project before any pricing begins.

  1. 01

    Hard bid

    You or your architect complete the drawings, and we provide a fixed price for exactly what they show.

  2. 02

    Construction management

    We manage the trades and the schedule for a fee, and you see the cost of each subcontract directly.

  3. 03

    Design-build

    We carry the design and construction together, which is typically the fastest path to opening.

A finished commercial kitchen in stainless steel: a gas range under an exhaust hood, a prep sink with a pre-rinse sprayer, a rolling work table stacked with pans and bowls, a walk-in cooler and a dry storage room at the back, under flat panel lights
02 COMMERCIAL KITCHENS

Commercial kitchens ready for service on opening day.

We coordinate the finishes, flooring and equipment of a commercial kitchen in the order your inspections require, so the kitchen is ready to open on schedule.

Finishes
Durable, easy-to-clean surfaces and seamless flooring.
Equipment
Set and connected ahead of final inspection.
A tradesman working along a drywalled wall on a commercial job
03 OPERATING BUILDINGS

Construction within operating buildings.

Most commercial projects take place alongside an active business. We phase the work so that essential areas of your building remain in operation, and we agree on the schedule for any loud or dusty work with you before construction begins.

Beginning a commercial project.

Share any existing drawings, access to walk the building and your key dates. If your drawings are still in progress, design-build allows pricing to begin while the design develops.

Your client portal is updated daily with the schedule, photographs and site notes, from the first day on site.

Drawings
Existing sets, or design-build while they develop
Access
A walk of the building with you
Dates
Your opening date and any fixed milestones

Our guide explains what a building permit in Oklahoma City involves. Read the guide

Our make-ready service prepares rental units between tenants. See the make-ready service

Share your opening date and we’ll walk the building with you.

Your site visit and written, itemized estimate are free.

From our clients

★★★★★
We contracted them for our commercial kitchen remodel and the difference in that space now is insane. … The customer service was great and the issues that came up were easily navigated due to their experienced team that came with options. I couldn’t recommend RDG more for any project- large or small. They were transparent from beginning to end.
DAVID S. · COMMERCIAL KITCHEN · GOOGLE

Plan your commercial project with us.

Share the address, your drawings if you have them and your opening date, and we’ll walk the building with you.

Your site visit and written, itemized estimate are free.

The request form opens in a new tab in Jobber, the same system that will run your client portal.